Which? says architect fees are usually around 15 per cent of a project, a figure that makes many Rugby homeowners wonder whether to hire an architect first or go straight to a builder who offers design and build. Neither route is wrong. The better first call depends on how complex the house and the brief are, and on whom you want the designer to work for. This guide compares the two routes, explains what the word architect legally means, shows where Rugby planning and building control fit, and lists the questions to ask before you sign. It is general information, not advice on your own house.
The short answer
Match the route to the house
In Rugby, an architect first suits a complex or unclear design, or a house in a conservation area, while design and build can suit a simple, well defined extension. No law requires an architect, but only someone on the ARB register may use the title. Whichever route you choose, compare written scopes, ask who the designer works for and who pays when the design changes.
Two routes that look similar and are not
An architect first means you appoint a designer who works for you and then ask builders to price the drawings, while design and build puts design and construction in one contract with one firm.
Which? describes design and build as one firm managing both the design and the construction under a single contract, and says this can be simpler than coordinating separate professionals. The architect route splits the job. You appoint the designer, agree the drawings, and then invite builders to price them. The two routes can end with the same brick extension on the back of the same Rugby house. What differs is who holds the pen, who is paid for what, and who you complain to when something does not fit.
The same Which? guide adds a third option that people forget: a good builder alone. It says a builder can often handle an extension, especially a kitchen extension or a loft conversion, and suggests considering an architect for larger work such as reconfiguring the house or adding a double storey extension. That matters because many homeowners assume the choice is a dramatic one between a famous name and a cowboy. For a plain rear extension, the honest answer is often a calm conversation about scope.
Check the guidance: Which?: advice from a builder and an architect (published 2 March 2026), Fifi McGee: do I need an architect for an extension?.
What the word architect legally means
No law requires you to use an architect for an extension, but only someone on the Architects Registration Board register may call themselves one professionally.
The Architects Registration Board says that in the UK a person must be on its Register of Architects to call themselves an architect professionally, and that using the title without being registered is a criminal offence. It adds that registered architects must hold appropriate qualifications, keep their skills up to date, follow the Architects Code and carry insurance. You can check anyone for yourself on the register at architects-register.org.uk, which takes a minute and costs nothing.
Build It magazine makes the other half of the point. There is no legal requirement to use an architect, and anyone can call themselves a designer. An architectural designer or technologist may be perfectly capable of drawing a straightforward extension, and some are excellent, but the title tells you less about their training and regulation. Build It also notes that architects complete seven years of training, five of study and two of practical experience, and that some also choose to become chartered members of RIBA. Treat the word designer as a prompt to ask for a portfolio and for references from domestic extension clients, not as a warning sign.
None of this tells you a particular architect is better value than a particular designer. It tells you what you can verify. If a firm describes someone as an architect, check the register. If it describes someone as a designer, ask about their qualifications, their insurance and who checks their drawings before they go to the council.
Check the guidance: Architects Registration Board: public information, Build It: who should design my extension?.

Where each route meets Rugby planning and building control
Whoever draws the extension, the Rugby planning and building control checks are the same, and they are separate from each other.
Rugby Borough Council's planning page explains that permitted development rights let you make some changes without planning permission, that those rights can be adapted or removed, and that they can differ for listed buildings and properties in conservation areas. It also says building regulations approval may be needed whether or not planning permission is. In other words, the design has to clear two separate checks, and a drawing that suits one can fail the other.
The table below shows how the routes line up against those checks. It is an original comparison for decision making, not a price list, and the right-hand column is a set of questions rather than answers.
| Route | Who you contract with | Who the designer works for | What to ask |
|---|---|---|---|
| Architect first | The architect for design, then a builder for construction | You | What stages are included, and can the builder price a drawing set that is complete enough? |
| Design and build | One firm for design and construction | The firm, within the contract you sign | Do I own the drawings if I walk away, and what happens to the fee? |
| Builder alone for a simple job | The builder, with drawings from a designer or technologist | Depends on who appoints them | Who is responsible when the drawings and the site disagree? |
| Designer or technologist first | The designer, then a builder | You | What qualifications and insurance do they hold, and who checks the structure? |
Planning: the application and the optional advice
Rugby Borough Council charges 115 pounds including VAT, from 1 April 2026, for pre-application advice on a householder extension. The council says the advice assesses how likely your proposal, as submitted, is to be granted and highlights the issues, but it does not commit the council to a decision. It also says that once you receive the formal response the case officer cannot advise further on that proposal without a new request and a new fee. That is a reason to put a finished idea in front of the council, not a half formed one.
Which? points out that an architect can handle the planning application but cannot guarantee approval, and the same is true of a design and build firm. Nobody can promise a decision. What you can ask is who prepares the application, who deals with the case officer, and what happens to the fee if the council asks for changes.
Building regulations: full plans or a building notice
Rugby's building control is run by Warwick Building Control, a partnership between Rugby Borough Council and Warwick District Council. Warwick District Council's guidance describes two routes. Full plans needs drawings, a specification and any calculations, and the council checks them before work starts. A building notice needs only a site plan, a form and the fee, and the page says drawings are not normally required. It also says the total cost is the same either way.
The Planning Portal calls full plans the route often used for larger schemes and complex work, and says the authority must decide within five weeks, or two months if you agree to extend. For an extension that involves steel, drainage or a complicated roof, the sensible reading is that you want the detail agreed on paper before the first trench is dug, whichever route the project takes. Ask each builder or designer which route they would use and why.
Check the guidance: Rugby Borough Council: do I need planning permission?, Rugby Borough Council: help with your planning application, Rugby Borough Council: Warwick Building Control, Warwick District Council: making a building regulations application, Planning Portal: full plans application.
When an architect first makes the most sense
The case for an architect first is strongest when the design is complex, the brief is unclear, or the house is listed or in a conservation area.
Which? says an architect offers more project support and often a more considered finish, particularly on complex projects or where the brief is unclear. Build It quotes a chartered building surveyor saying that as the complexity of the extension rises, so does the need for qualified architectural input. Both are sensible reasons, and both are conditions you can test against your own house rather than a sales pitch.
Rugby has 19 conservation areas, and the council says it has extra powers to control development in them and asks householders to speak to its development control team before starting any work. If your house sits in one, an architect who has dealt with the character appraisal for that area is a practical asset. Build It makes the same recommendation for listed buildings and conservation areas, suggesting an architect with heritage experience. Read the appraisal for your area before you brief anyone, because it shapes what the council is likely to accept.
Check the guidance: Which?: advice from a builder and an architect (published 2 March 2026), Build It: who should design my extension?, Rugby Borough Council: conservation areas and character appraisals, Fifi McGee: do I need an architect for an extension?.

When design and build can suit a simple Rugby extension
Design and build tends to suit a well defined, conventional extension where you want one contract, one point of contact and a single firm answerable for design and construction.
A rear extension with a conventional layout, a clear idea of how it connects to the kitchen and no heritage constraints is the kind of job where one firm handling design and construction can reduce friction. Which? says this can be simpler than coordinating separate professionals. There is no need for the builder to interpret someone else's drawings, because the same firm drew them. That can mean fewer finger pointing moments when a detail does not work on site.
The trade off sits in the same place as the benefit. Because the designer works inside the builder's company, the design is shaped by what that firm likes to build, and the usual market checks are weaker. With an architect's drawings you can ask two or three builders to price the same scheme and compare them line by line. With design and build you have one price for one design, so you must work harder to test it. Ask for a written scope that lists what is and is not included, and ask what happens if you want a different builder after the design is done.
Check the guidance: Which?: advice from a builder and an architect (published 2 March 2026).
What the sources say about fees, and what they do not
Which? says architect fees are usually around 15 per cent, one architect's blog says 8 to 12 per cent without a source, and no source opened gives a verified Rugby fee.
The two fee figures do not agree, and neither is a quotation. Which? says architect fees are usually around 15 per cent of the project and tells readers to budget for it. The Fifi McGee blog gives around 8 to 12 per cent of the project fee, with no source for the figure. Both are percentages of a build cost you do not yet know, so they are a way to frame a conversation, not a budget line. Do not plan a Rugby budget around either number.
The sources opened for this guide do not give a verified Rugby fee for an architectural designer or for a design and build service, so this guide does not offer one. Search results showed several directory pages with cost ranges, but those pages were not opened or could not be opened, and a search snippet is not evidence. Anyone quoting you a fee should state in writing what stages it covers, whether VAT is included, and what extra work is charged separately.
Check the guidance: Which?: advice from a builder and an architect (published 2 March 2026), Fifi McGee: do I need an architect for an extension?.

Questions to put to anyone before you sign
The best protection is a written scope that says who designs, who submits, who owns the drawings and who pays when the design changes.
Use the same questions with an architect, a designer or a design and build firm. The answers matter more than the label on the contract, and a firm that answers clearly in writing is easier to work with than one that reassures you in conversation.
- Who is the designer, what are their qualifications, and can I check them on the ARB register or with their professional body?
- Which stages does the fee cover, and what is charged separately, such as structural calculations, surveys, planning fees and building control fees?
- Who submits the planning application and the building regulations application, and who deals with the council's questions?
- Do I own the drawings if I part company, and can another builder price them?
- How are design changes handled during the build, and who pays for them?
- When does the price become fixed, what is provisional, and what happens if the ground, a drain or a structural check changes the design?
- Can I see a domestic extension in a similar Rugby house type, and can I speak to the client?
Check the guidance: Which?: advice from a builder and an architect (published 2 March 2026), Architects Registration Board: public information.
Which? also advises avoiding a choice made on price alone and never paying in cash. Build costs and design fees are separate lines, so compare them separately.
Bottom line: Choose the route that matches the complexity of your house and brief, then get the scope, the responsibilities and the price in writing before you commit.
What clients say
Recent words from Belmax clients.
Three public five-star review excerpts, checked 24 September 2026.
“We have been really happy with the service from Belmax Builders. They are reliable, professional and, most importantly, always kept to the agreed schedule.”
“Belmax did the job to very high standard, communicated with us the whole time and explained really well what to expect.”
“Job was started on time and Rob kept us up to date every step of the way. The finished conversion looks amazing.”
Frequently asked questions
Do I need an architect for an extension in Rugby?
No law requires one. Build It magazine says there is no legal requirement to use an architect, and Which? says a builder can often handle an extension. An architect is most useful for a complex design, an unclear brief, or a house in one of Rugby's 19 conservation areas. If someone calls themselves an architect, check the ARB register, because only registered people may use the title.
Is design and build cheaper than using an architect?
The sources opened do not say. Which? says design and build can be simpler because one firm holds one contract, but it gives no comparison of total cost. Architect fees are quoted at around 15 per cent by Which? and 8 to 12 per cent by one blog without a source. Compare whole costs in writing, including planning fees, building control and what happens if the design changes.
Who does a designer in a design and build firm work for?
Usually the firm, not you. One architect's blog points out that unlike an architect you appoint yourself, a designer inside a design and build company works for the builder. That is not wrong, but it means the drawings serve the contract you sign. Ask who owns the drawings, whether another Rugby builder could price them, and how design changes are charged.
Can an architect guarantee my planning permission?
No. Which? says an architect can handle a planning application but cannot guarantee approval, and a design and build firm cannot either. Rugby Borough Council offers pre-application advice for householder extensions at 115 pounds including VAT from 1 April 2026, but says it does not commit the council to a decision. Ask who submits the application and what happens to the fee if changes are needed.
What is the difference between full plans and a building notice?
Warwick District Council says full plans needs drawings, a specification and any calculations, and the council checks them before work starts. A building notice needs only a site plan, a form and the fee, and the cost is the same either way. Warwick Building Control runs building control in Rugby. For an extension with steel or drainage, ask your designer which route they would use.
Sources
Figures, fees and rules change. Every source below was checked on 12 November 2026.
- Which?: advice from a builder and an architect (published 2 March 2026)Opened 12 November 2026: a builder can often handle an extension, an architect suits larger or unclear projects, design and build is one firm under one contract, architect fees are usually around 15 per cent, and an architect cannot guarantee planning approval.
- Build It: who should design my extension?Undated magazine guide, opened 12 November 2026: no legal requirement to use an architect, anyone can call themselves a designer, and complex or conservation area projects benefit most from architectural input.
- Fifi McGee: do I need an architect for an extension?Architect's own blog, dated 30 October with no year, opened 12 November 2026: an architect is not required, can be hired for some phases only, and fees are given as around 8 to 12 per cent with no source.
- Architects Registration Board: public informationOpened 12 November 2026: a person must be on the ARB Register to call themselves an architect professionally, and using the title without registration is a criminal offence.
- Rugby Borough Council: do I need planning permission?Opened 12 November 2026: permitted development rights can be adapted or removed and can differ for listed buildings and conservation areas, and building regulations approval may be needed whether or not planning permission is.
- Rugby Borough Council: help with your planning applicationOpened 12 November 2026: from 1 April 2026 householder extension pre-application advice costs 115 pounds including VAT, and it does not commit the council to a decision.
- Rugby Borough Council: conservation areas and character appraisalsOpened 12 November 2026: Rugby has 19 conservation areas, the council has extra powers to control development in them, and householders should speak to development control before starting work.
- Rugby Borough Council: Warwick Building ControlOpened 12 November 2026: Warwick Building Control, a partnership between Rugby Borough Council and Warwick District Council, runs building control in Rugby.
- Warwick District Council: making a building regulations applicationOpened 12 November 2026: full plans and building notice cost the same, full plans needs drawings, a specification and any calculations, and a building notice needs only a site plan, a form and the fee.
- Planning Portal: full plans applicationOpened 12 November 2026: full plans lets the authority check work before it starts, is often used for larger or complex work, and is decided within five weeks, or two months if you agree.