A title register costs £7 from HM Land Registry, and the council's planning register can be searched online, yet those two checks can decide whether a new-build extension in Rugby needs a full planning application, the developer's consent, or both. A third document, your warranty certificate, shows what cover the extension will not share. Most owners find all three after the drawings are paid for. This guide shows where each answer sits, what the national sources opened on 20 November 2026 say, and which questions belong to a solicitor, the council or your warranty provider before a builder prices anything.
The short answer
Check the paperwork before the plans
Before you pay for drawings on a new-build home in Rugby, check three things: whether the estate's planning permission removed permitted development rights, whether the title register holds a covenant needing the developer's consent, and what your warranty says about added work. NHBC's Buildmark does not insure alterations such as extensions. Each check is cheap and decides your route.
Four documents sit between you and a drawing
Four documents decide what you can build on a new estate: the planning permission with its conditions, the title register, your warranty certificate and any paperwork from the developer.
An older house raises one question, which is what the rules allow on this plot. A new-build raises four, because the developer has already made promises to the council, to a warranty provider and in the transfer of the land, and those promises travel with the house. Most owners meet them when a designer asks.
Gather the papers in this order. The planning decision notice for your estate shows any conditions. The title register shows covenants. The warranty certificate names the provider and the date cover began. The papers from your purchase may already hold copies, so look there before you pay for anything. None of this is a Belmax document: it belongs to you, the council, HM Land Registry and your warranty provider.
This is general information, not legal advice, and it gives no Belmax price.
A planning condition can switch permitted development off
Permitted development rights can be removed by a condition on the planning permission or by an article 4 direction, so a new estate may need a full householder application for work that an older street could build without one.
GOV.UK planning guidance says permitted development rights can be removed by the local planning authority, by a condition on a planning permission or by an article 4 direction, and that the restrictions vary case by case with the wording of the condition or direction. It adds that an article 4 direction only means a development cannot be carried out under permitted development, so it needs a full application rather than being banned.
Rugby Borough Council says the same in plainer words: permitted development rights can be adapted or removed, and the status of your property may have been flagged when you bought it. The Planning Portal lists areas where a planning condition, article 4 direction or other restriction limits or removes the rights, and tells homeowners to check before applying or starting work. Neither page says how common this is on new estates in Rugby, so assume nothing either way.
| Question | Where to look | What it can tell you |
|---|---|---|
| Did the estate permission remove permitted development? | The decision notice and conditions on the council's planning register, reached through the council's find a planning application link | Whether a condition withdraws rights, and what its wording covers |
| Is there an article 4 direction? | Rugby Borough Council, with the Planning Portal guidance alongside | Whether an area direction removes some or all rights |
| Can the council confirm it formally? | A lawful development certificate for the proposed work | A formal council document that proposed work does not need permission |
Condition or article 4: why the difference matters
A guide on New-Builds.co.uk dated 23 February 2026 presents an article 4 direction and a condition on the original permission as one thing. GOV.UK treats them as two routes. The first is written into your estate's own decision notice, so you read that document. The second is a direction made by the council for an area, so you ask the council. Mixing them up sends people to the wrong place for the answer.
If the rights have gone
Then the practical route is a householder planning application, which the council decides on its merits. Rugby Borough Council says it offers pre-application advice for all types of proposed works, for a fee, so weigh that against simply applying. A lawful development certificate is for proposed work that does not need permission, so it is the wrong tool where a condition has removed the rights.
The permitted development limits themselves are covered in our guides on extending a 1930s semi and planning permission for an extension in Rugby Borough.
Check the guidance: GOV.UK: when is permission required?, Rugby Borough Council: do I need planning permission?, Planning Portal: planning permission for extensions.

What a full application costs, and the 8 December change
The Planning Portal gives £548 for a typical householder application in England, and the GOV.UK schedule that takes effect on 8 December 2026 lists £575 for a single dwellinghouse.
These are national fees paid to the council, not Belmax charges, and they leave out drawings, surveys and any consultant. The Planning Portal fee page is undated apart from a 2026 footer, so confirm £548 in the fee calculator when you apply.
The GOV.UK document Fees for planning applications in England from 8 December 2026 says the new fees take effect on that date and that annual indexation adds 3.5% from 1 April 2027. It also introduces a flat £310 fee for certain prior approval applications that previously carried none.
A difference of £27 is small beside the cost of a wrong turn, so do not rush an application to beat the date. Whichever side of it you file on, finish the checks in this guide first, because a design built on rights the estate lost has to be redrawn.
| Application | Fee | Source and timing |
|---|---|---|
| Householder application, typical | £548 | Planning Portal, undated, 2026 footer |
| Householder application, single dwellinghouse | £575 | GOV.UK schedule, from 8 December 2026 |
| Certificate of lawful development, proposed work | Half the full application fee | GOV.UK schedule, from 8 December 2026 |
| Prior approval, larger rear extension | £310 flat | GOV.UK schedule, from 8 December 2026 |
Check the guidance: Planning Portal: how much does a planning application cost?, GOV.UK: fees for planning applications in England from 8 December 2026.
The title register and the developer's say-so
The title register is the document that shows whether a restrictive covenant binds your home, and it costs £7 to download from HM Land Registry.
GOV.UK says the title register and title plan each cost £7 to download, that an online copy cannot be used as proof of ownership and that an official copy costs £11 per document. The register usually includes details of restrictive covenants, which are promises not to do certain things with the land. In some cases it only names the document that holds the detail, so you may need to ask for that document as well.
We give no consent fee and no covenant period. The two New-Builds.co.uk guides opened for this article quote some, such as about four years of consent or fees of £200 to £1,000, without a source. Your own register is the reliable answer.
Developer consent is not planning consent
Barratt Homes says on its customer service page about changes to a new home that planning consent is needed for extensions outside permitted development, and that developer or lessor permission does not replace it. For conservatories on freehold homes less than 10 years old, it says developer consent would definitely be required. That is one developer's wording for its own homes, not a rule for every Rugby estate. It does show how two approvals can stack: the council's and whoever your covenant names.
Check the guidance: GOV.UK: get information about a property from HM Land Registry, New-Builds.co.uk: legal guide to extending or modifying a new build.

What the warranty covers, and what an extension adds
NHBC's Buildmark summary lists any alteration, modification or addition to the home as not insured, with extensions and loft conversions named as examples.
For plots registered from 1 April 2025, NHBC's Insurance Product Information Document describes a two year builder warranty period followed by eight years of insurance cover. Its not insured list includes any alteration, modification or addition to the home, with extensions and loft conversions given as examples of works carried out after NHBC final inspection.
Your plot may have been registered earlier, and your home may not have NHBC cover at all, so read your own certificate and policy booklet. We opened no other provider's terms and make no claim about them.
Inside the first two years
NHBC says the builder is responsible during this period for fixing problems caused by its failure to meet NHBC requirements, and that the period is usually two years from the policy start date on your certificate. Before NHBC's resolution service can help, you notify the builder, allow reasonable time and access, and finish the builder's complaints process.
Homebuilding reported in March 2023 a dispute at Mickleover, near Derby, in which the developer, Avant Homes, said an extension built after purchase had voided parts of the owner's NHBC warranty and caused many of the problems. The owner disputed that, and the report carries no NHBC comment, so read it as a reason to ask, not a ruling.
Years three to ten
Insurance then runs for eight years and covers damage caused by defects in specific parts of the home, such as foundations not built to NHBC requirements. An extension joins that original structure, so the useful question for your provider is how the work should be done and recorded so that cover for the original house stays clear. The summary we read sets no notification rule, so ask in writing and keep the reply.
Check the guidance: NHBC: Buildmark insurance product information document (plots registered from 1 April 2025), NHBC: Buildmark, first two years.
Building control, party walls and a small plot
Planning permission, building regulations and the Party Wall etc Act 1996 are three separate approvals, and a plot with a house close to the boundary can bring all three into play.
Rugby Borough Council says Warwick Building Control, a partnership between Rugby Borough Council and Warwick District Council, now runs the building control service in Rugby. The page gives no fees or inspection steps, so ask the service directly. Our guide to extension building regulations in Rugby explains what inspectors check.
The GOV.UK party wall guidance says the Act covers new building on or at the boundary, work to a party wall and excavation near neighbouring buildings, and that it is separate from planning permission and building regulations approval. We have no source on plot sizes on Rugby estates, so we make no claim about yours. Measure from the house to each boundary before the design starts, because distance feeds both the planning rules and any party wall question.
Drains are the other plot-specific check. Our guide to building an extension over a drain explains why a manhole near the rear wall belongs on the first sketch.
Check the guidance: Rugby Borough Council: Warwick Building Control, GOV.UK: Party Wall etc Act 1996 guidance.

Who to ask, in what order, before any drawing
Do the free and cheap checks first, get the answers in writing and hand them to your builder with the brief, so the quotation is for work you are allowed to build.
Belmax is a builder, not your solicitor, the council or your warranty provider, so most of the answers below come from them. Once you hold them, a builder can price a design that fits.
- Has the planning permission for my estate removed permitted development rights, and what exactly does the condition say?
- Is there an article 4 direction or a conservation area that affects my address?
- What does my title register say about restrictive covenants, and who must consent to an extension?
- Who provides my warranty, when did cover begin and what does the policy say about alterations?
- Will the developer and the warranty provider confirm in writing that they know about the planned work?
- If rights have been removed, is a pre-application conversation or a householder application the better route, and what is the fee on the day I apply?
- Is any work on or near the boundary, and do I need to serve notice on a neighbour?
- What do I send builders: the register, the conditions, the warranty certificate, photographs of the rear and side, and any drawings?
What clients say
Recent words from Belmax clients.
Three public five-star review excerpts, checked 24 September 2026.
“We have been really happy with the service from Belmax Builders. They are reliable, professional and, most importantly, always kept to the agreed schedule.”
“Belmax did the job to very high standard, communicated with us the whole time and explained really well what to expect.”
“Job was started on time and Rob kept us up to date every step of the way. The finished conversion looks amazing.”
Frequently asked questions
Can you extend a new-build home in Rugby?
It can be done, but the route depends on documents you may not have read yet. A condition on the estate's planning permission can remove permitted development rights, which would mean a householder planning application. The title register may hold a covenant, and the warranty does not cover the extension. Rugby Borough Council says rights can be adapted or removed, so check the planning register and your title register before paying for drawings.
Does an extension void a new-build warranty?
NHBC's Buildmark summary lists any alteration, modification or addition to the home, with extensions and loft conversions as examples, as not insured, so the extension itself is not covered. How far it affects cover for the original house is a question for your own policy. A 2023 Homebuilding report records a developer claiming an extension voided parts of an owner's warranty, which the owner disputed. Ask your provider in writing before work starts.
How do I find out if permitted development rights were removed?
Read the decision notice and conditions for your estate on the council's planning register, which Rugby Borough Council reaches through its find a planning application link. GOV.UK says rights can be removed by a condition or by an article 4 direction, and that the wording varies case by case. If you think the work is allowed, a lawful development certificate gives a formal council answer for proposed work.
What does a covenant on a new-build mean for an extension?
A restrictive covenant is a promise not to do certain things with the land, and the title register usually records it or names the document that does. It can mean the developer's consent is needed as well as planning permission. Barratt Homes says developer permission does not replace planning consent. A title register costs £7 from HM Land Registry, so read yours before asking any builder to quote.
How much does planning permission cost for a new-build extension?
The Planning Portal gives £548 for a typical householder application in England. The GOV.UK schedule taking effect on 8 December 2026 lists £575 for a single dwellinghouse, and a proposed lawful development certificate costs half the full application fee. Those are council fees only and exclude drawings and consultants. This guide gives no Belmax price, so ask builders to quote the construction separately once you know the route.
Sources
Figures, fees and rules change. Every source below was checked on 20 November 2026.
- GOV.UK: when is permission required?Opened 20 November 2026. Rights removed by condition or article 4 direction; wording varies case by case.
- Planning Portal: planning permission for extensionsOpened 20 November 2026. Planning condition, article 4 direction or other restriction can limit or remove rights.
- Rugby Borough Council: do I need planning permission?Opened 20 November 2026. Rights can be adapted or removed; pre-application advice carries a fee.
- Planning Portal: lawful development certificatesOpened 20 November 2026. A formal council document confirming proposed work does not need planning permission; the page gives no fee.
- Planning Portal: how much does a planning application cost?Opened 20 November 2026. £548 for a typical householder application in England; undated apart from a 2026 footer.
- GOV.UK: fees for planning applications in England from 8 December 2026Opened 20 November 2026. £575 householder fee for a single dwellinghouse; proposed lawful development certificate half the full fee; £310 prior approval fee for larger rear extensions.
- GOV.UK: get information about a property from HM Land RegistryOpened 20 November 2026. Title register £7; covenants usually included or referenced.
- NHBC: Buildmark insurance product information documentOpened 20 November 2026. Alterations, modifications and additions, including extensions, not insured; two year builder warranty then eight years of insurance.
- NHBC: Buildmark, first two yearsOpened 20 November 2026. Builder responsible for defects in the first two years; steps before NHBC resolution.
- Homebuilding: how an extension can void your newbuild warrantyPublished 24 March 2023, opened 20 November 2026. One dispute, in which a developer and an owner disagree; no NHBC comment.
- Barratt Homes: making changes to your new homeOpened 20 November 2026. One developer's own wording on planning, developer consent and conservatories.
- GOV.UK: Party Wall etc Act 1996 guidanceOpened 20 November 2026. Separate from planning permission and building regulations approval.
- Rugby Borough Council: Warwick Building ControlOpened 20 November 2026. Runs building control in Rugby.
- New-Builds.co.uk: legal guide to extending or modifying a new buildDated 23 February 2026, opened 20 November 2026. Competitor guide with unsourced figures; cited as comparison only.