A single storey rear extension on a terraced house can go 3 metres back without a planning application, or 6 metres with prior approval, yet in Rugby a first question is often the wall you share. Work to it needs two months' notice under the Party Wall etc Act 1996, and a new boundary wall or deep digging needs one month. Conservation areas can change the planning answer, and national price guides leave out the surveyor. This guide sets out what the sources opened on 23 November 2026 say and the checks to make before drawings.
The short answer
Neighbour, three metres, then the council
For a terraced house in Rugby, check three things before drawings: party wall notices, because work to a shared wall needs two months' notice; the permitted development depth of 3 metres, or 6 with prior approval; and whether your street is one of Rugby's 19 conservation areas. Each answer decides your route and your budget, and none comes from a builder's price.
Your neighbour's wall comes before your drawings
A terraced extension usually touches a wall you share, and the Party Wall etc Act 1996 sets separate minimum notice periods of two months for work to that wall and one month for a new boundary wall or deep digging.
The GOV.UK explanatory booklet published on 12 May 2016 sets out three notices. Work to an existing party wall needs a notice at least two months before the planned start. A new wall built at the boundary needs at least one month. Excavation near a neighbouring building, below its foundation level, needs at least one month. A notice is only valid for a year, so it should not be served long before the date you want to start.
The neighbour then has 14 days. If they do not answer a notice for work to the wall, or for excavation, in that time, the booklet says a dispute is deemed to have arisen. The FMB adds a point owners miss: written consent from a neighbour does not automatically shorten the notice period. Starting earlier needs a proper written agreement. Planning permission and building regulations approval are separate; the GOV.UK guidance page treats party walls as their own process.
| Notice | Work it covers | Minimum notice | If the neighbour is silent |
|---|---|---|---|
| Party structure notice (section 2) | Work to an existing party wall | Two months before the start | A dispute is deemed after 14 days |
| Line of junction notice (section 1) | A new wall at the boundary | One month before the start | The wall must go wholly on your land if no written consent in 14 days |
| Adjacent excavation notice (section 6) | Digging near a neighbouring building | One month before the start | A dispute is deemed after 14 days |
When the neighbour disagrees
A disagreement is not a veto. Homebuilding, on an article last updated on 7 July 2022, says neighbours cannot block work simply because they dislike it, since that is a planning matter, and that a verbal agreement is not recognised: consent or objection must be in writing. In a dispute, one agreed surveyor, or one each, produces an award setting out the work, timings and protection, and the booklet says the building owner usually pays its costs where the work is solely for their benefit.
Starting without a valid notice is the expensive mistake. Homebuilding says a neighbour can apply to the County Court for an injunction, and the FMB says starting affected work without the proper process can lead to an injunction and delays.
What a surveyor can cost
There is no fixed fee. Homebuilding estimates about £1,000 to £2,000 plus VAT for a straightforward job outside London with a neighbour who dissents. The FMB cites about £1,000 from the HomeOwners Alliance and says an agreed single surveyor saves money, and that written consent from the neighbour avoids an award altogether. These are market estimates, not a Belmax price, so ask for an itemised quote that states VAT.
Check the guidance: GOV.UK: the Party Wall etc Act 1996 explanatory booklet, FMB: party wall agreements, what you need to know, GOV.UK: Party Wall etc Act 1996 guidance.

Three metres back, or six with prior approval
For a terraced house, permitted development allows a single storey rear extension up to 3 metres beyond the original rear wall, or up to 6 metres through a prior approval application, with a 4 metre height limit.
The Planning Portal sets the depth for any house other than a detached one at 3 metres, rising to 6 metres through prior approval, but not on Article 2(3) land. Ask the council whether your address is on it; Rugby's 19 conservation areas are the place to start. Single storey rear extensions cannot exceed four metres in height, and within 2 metres of a boundary the eaves are capped at 3 metres.
The same page lists limits that apply to every extension: no more than half the land around the original house covered, no higher than the highest part of the existing roof, and materials that look similar to the existing house. The HomeOwners Alliance repeats the 3 and 6 metre depths for terraced houses and adds that a leaseholder should check the lease first. Neither page is a decision about your address: the council confirms that.
| Work | Limit in the guidance | What changes it |
|---|---|---|
| Single storey rear, terraced | 3 metres, or 6 metres with prior approval; 4 metres high | Prior approval is not available on Article 2(3) land |
| Eaves near a boundary | 3 metres within 2 metres of the boundary | A taller eave is outside the limit |
| Side extension | Single storey, up to 4 metres high, up to half the original house width | Planning permission is always needed on Article 2(3) land |
| Rear extension of more than one storey | No more than 3 metres, not within 7 metres of the rear boundary | Planning permission is required on Article 2(3) land |
The 6 metre route is an application, not a right
Between 3 and 6 metres you notify the council through a prior approval application, which the Planning Portal says is needed for the larger depth. The Portal summary does not say what the council weighs or how long it takes, so ask Rugby Borough Council before you assume a 6 metre room is simple.
Check the guidance: Planning Portal: planning permission for extensions, HomeOwners Alliance: home extension, where do I start?.
Site access in a terrace: ask, notify, agree
A terraced house may have no side route to the garden, so the way in for materials and scaffolding is a question for neighbours and the party wall process, not something to assume.
Neither the Planning Portal nor the Homebuilding terrace guide, published on 16 January 2023, says how a builder reaches the back of a terraced house, so treat this as a question to settle. Ask your builder where materials will be stored, where skips and scaffolding will stand, and whether anything needs to cross a neighbour's land.
If the work falls under the Party Wall Act, the booklet says 14 days' notice of entry must be given, except in an emergency, and that the adjoining owner must admit the building owner's workmen and surveyors when necessary. Refusing or obstructing entry, knowing the person is entitled to enter, is an offence.
Where the party wall route stops
Not every job triggers the Act, so access can still need a plain agreement. Section 1 of the Access to Neighbouring Land Act 1992 lets a court order access where works on your own land need it, but its list of basic preservation works is about maintenance, repair and clearing. It does not mention new building, so do not rely on a court order as a plan B for an extension. A solicitor can say whether it applies to your case.
Check the guidance: GOV.UK: the Party Wall etc Act 1996 explanatory booklet, Homebuilding: how to add a terrace house extension.
Rugby addresses that change the answer
Rugby has 19 conservation areas where the council has extra powers over development, so a terraced extension there can lose the rights a street outside would keep.
Rugby Borough Council says Rugby currently has 19 conservation areas, where the council has extra powers to control development, and that you should check with its development control team before carrying out work to a property in one. Its page on whether you need planning permission says permitted development rights can be different for listed buildings and properties in conservation areas, and that the council offers pre-application advice for a fee. It does not list the streets or give fee amounts on those pages.
Building control is the other local step. Rugby Borough Council says Warwick Building Control, a partnership with Warwick District Council, now runs building control in Rugby. Warwick District Council's building regulations page says inspection requests made before 10:30am can be on site the same day, Monday to Friday, and that concrete should only be provisionally booked until foundations have been inspected and approved. For a terrace, that ties in with the party wall excavation notice: the digging, the notice and the foundation inspection need to line up. Our guide to extension building regulations in Rugby explains what inspectors check.
Check the guidance: Rugby Borough Council: conservation areas, Rugby Borough Council: do I need planning permission?, Rugby Borough Council: Warwick Building Control, Warwick District Council: building regulations.

National price guides, worked through for a 20 square metre room
Two guides opened today put a standard single storey extension at £1,500 to £2,250 per square metre and £48,000 plus VAT for 20 square metres, and neither prices party wall work.
The HomeOwners Alliance gives an average of £48,000 plus VAT for a standard 20 square metre single storey extension, an architect fee of usually around 15% and about 10% spare for surprises. Homebuilding's terrace guide gives approximately £1,500 to £2,250 per square metre of new internal space, but its own worked example prints the low end of a 30 square metre job as £45,500 when the sum gives £45,000, and it is unclear whether VAT is included.
Neither source is a Belmax quotation, and neither is Rugby specific. Both pages are undated, so use the figures only as a range to compare quotes against. Our extension cost per m2 guide explains what such a figure includes.
| Source | Working | Result for 20 square metres |
|---|---|---|
| HomeOwners Alliance average | £48,000 plus 20% VAT of £9,600 | £57,600 including VAT |
| Homebuilding, low end | £1,500 per square metre times 20 | £30,000, VAT treatment unclear |
| Homebuilding, high end | £2,250 per square metre times 20 | £45,000, VAT treatment unclear |
| Party wall surveyors, if a neighbour dissents | Homebuilding estimate, outside London | £1,000 to £2,000 plus VAT |
Check the guidance: HomeOwners Alliance: home extension, where do I start?, Homebuilding: how to add a terrace house extension.
Lease and insurer: two permissions people forget
If you rent your terraced house from a freeholder or hold a lease, check what it allows before paying for drawings, and tell your home insurer before work starts.
The HomeOwners Alliance says a leaseholder should check whether the lease allows alterations, because freeholder approval may be needed and can add cost. It also says to tell your home insurer before work starts, since your premium may rise and an undisclosed project could void your policy. Our guide to home insurance during building work covers that conversation.
If the new room will sit over or near a drain, read our guide to building an extension over a drain. If you are weighing going up instead, see loft conversion in a terraced house.
Check the guidance: HomeOwners Alliance: home extension, where do I start?.

A one-page brief for the first builder visit
Walk into the first quote with the questions below answered or marked as open, and the builder can price what you can actually build.
Write these down before you ask for prices, and send them with photographs of the rear of the house and the boundaries on both sides.
- Is my house a terrace, and could my plan stay inside 3 metres, or do I need the 6 metre prior approval route?
- Am I in one of Rugby's 19 conservation areas, or is my property listed?
- Which of the three party wall notices does the plan need, and have I talked to both neighbours before serving them?
- Where will materials, skips and scaffolding go, and does anything cross a neighbour's land?
- Do I rent from a freeholder, and what does the lease say about alterations?
- Has my insurer been told, and is the surveyor's fee in the budget, with VAT stated?
- Who books the Warwick Building Control foundation inspection before concrete is poured?
What clients say
Recent words from Belmax clients.
Three public five-star review excerpts, checked 24 September 2026.
“We have been really happy with the service from Belmax Builders. They are reliable, professional and, most importantly, always kept to the agreed schedule.”
“Belmax did the job to very high standard, communicated with us the whole time and explained really well what to expect.”
“Job was started on time and Rob kept us up to date every step of the way. The finished conversion looks amazing.”
Frequently asked questions
Do I need a party wall agreement for a terraced house extension?
Often, yes. A terraced extension commonly means work to a shared wall, a new wall at the boundary or digging near a neighbour's foundations, and each needs a notice under the Party Wall etc Act 1996. GOV.UK sets minimum notice periods of two months for work to a party wall and one month for a new boundary wall or excavation. Planning permission is separate, so check both before work starts in Rugby.
How far can I extend a terraced house without planning permission?
The Planning Portal says a single storey rear extension on a house other than a detached one can go up to 3 metres beyond the original rear wall under permitted development, or up to 6 metres with prior approval, with a 4 metre height limit. Prior approval is not available on Article 2(3) land. Rugby Borough Council has 19 conservation areas where it has extra powers, so confirm your address with the council first.
How much notice must I give a neighbour for party wall work?
The GOV.UK explanatory booklet says at least two months before the planned start for work to an existing party wall, and at least one month for a new wall at the boundary or for excavation near a neighbouring building. A notice is valid for a year. The neighbour has 14 days to respond to a notice for work to the wall or for excavation, after which a dispute is deemed to have arisen.
What if my neighbour refuses to agree to the extension?
A refusal under the Party Wall etc Act starts a dispute, which an agreed surveyor, or one each, settles through an award. The FMB says you usually pay the surveyors' fees when the work is for your benefit, and Homebuilding estimates £1,000 to £2,000 plus VAT outside London. Neighbours cannot stop the work because they dislike it, since that is a planning matter, but starting without a valid notice risks an injunction.
How much does a terraced house extension cost?
National guides give a rough range, not a Rugby quotation. The HomeOwners Alliance gives an average of £48,000 plus VAT for a standard 20 square metre single storey extension, which is £57,600 with VAT. Homebuilding gives £1,500 to £2,250 per square metre, undated and unclear on VAT. Add party wall surveyor fees, architect fees of around 15% and about 10% spare, and compare quotes line by line.
Sources
Figures, fees and rules change. Every source below was checked on 23 November 2026.
- GOV.UK: the Party Wall etc Act 1996 explanatory bookletOpened 23 November 2026. Published 12 May 2016. Notice periods, 14 day response, notice valid for a year, access, who pays.
- GOV.UK: Party Wall etc Act 1996 guidanceOpened 23 November 2026. Work the Act covers; separate from planning and building regulations.
- Planning Portal: party walls, other permissions you may requireOpened 23 November 2026. A separate piece of legislation with different requirements to the building regulations; gives no timings.
- Planning Portal: planning permission for extensionsOpened 23 November 2026. Permitted development depths, heights, eaves, side and two storey rules; Article 2(3) land.
- FMB: party wall agreements, what you need to knowOpened 23 November 2026. Notice types; consent does not shorten notice; surveyors and fees; undated.
- Homebuilding: party wall agreementsOpened 23 November 2026. Updated 7 July 2022; fees estimate; injunction; written consent only.
- Homebuilding: how to add a terrace house extensionOpened 23 November 2026. Published 16 January 2023; per square metre range, undated; party wall without process.
- HomeOwners Alliance: home extension, where do I start?Opened 23 November 2026. £48,000 plus VAT for 20 square metres; terraced limits; lease and insurer; undated.
- Rugby Borough Council: conservation areasOpened 23 November 2026. 19 conservation areas.
- Rugby Borough Council: do I need planning permission?Opened 23 November 2026. Rights can differ in conservation areas; pre-application advice for a fee.
- Rugby Borough Council: Warwick Building ControlOpened 23 November 2026. Runs building control in Rugby.
- Warwick District Council: building regulationsOpened 23 November 2026. Inspection booking times; foundations inspected before concrete.
- legislation.gov.uk: Access to Neighbouring Land Act 1992, section 1Opened 23 November 2026. Court access orders; basic preservation works; no mention of new building.